Synopsis
The canonical APS/ASU Red Rock Solar facility is a 40-MW operating solar plant; ASU reports its allocation was commissioned in December 2016.
Official operating evidence is presented even though the tracker classification is stale. The separate adjacent PZ-PA-014-26 proposal is not this facility.
The community tracker currently labels this project Planning. The dated record and official links below should be used to check that label and any later change.
Links
Official owner and offtaker
Official utility context
Contractor context
Separate adjacent proposal
Official monitoring portals
Timeline & Milestones
Scroll or swipe to explore
How to get involved
How to participate in Red Rock Solar — Adjacent proposal only: PZ-PA-014-26
Use the verified project record and monitor the correct agency for the next live notice.
No open proceeding or ACC docket was verified for the operating Red Rock Solar facility. PZ-PA-014-26 identifies a distinct adjacent proposal only.
-
Save the exact identifiers: Adjacent proposal only: PZ-PA-014-26
Use Adjacent proposal only: PZ-PA-014-26 in searches, subject lines, comments, and records requests. Do not substitute a similarly named project or general-policy docket. -
Read the project-specific record
Open the official record linked below and verify the present status, scope, meeting location, submission method, and deadline before acting. -
Treat old deadlines as closed
The July 16, 2026 adjacent-project item was a work session, not a public hearing, and is closed. -
Monitor the next live notice
Monitor Pinal notices for PZ-PA-014-26 only if following the distinct adjacent proposal; do not label it the operating Red Rock Solar docket.