Synopsis

Red Rock Solar is APS's operating solar facility near Red Rock. APS has described the whole facility as 40 MW. ASU's official project page describes its own portion as approximately 29 MW of direct-current generating capacity, with 28,800 kWdc in its equipment table, commissioned in December 2016. Those are different scopes and measurement bases, not evidence of two competing plant sizes. ASU says APS owns the system and agreed to supply it 65,000 megawatt-hours a year under a 20-year arrangement.

The solar-and-battery item in the November public-participation schedule is a separate neighboring proposal. County case PZ-PA-014-26 is the ASLD Solar and Battery Energy Storage project east of the existing APS Red Rock Solar facility, about three miles southeast of the Red Rock community. LSH Land Holdings, LLC is the applicant, 39 North, LLC its representative, and the Arizona State Land Department the landowner. It must not be described as the operating APS facility's permit, a confirmed APS expansion, or proof that batteries are installed at the existing plant.

Earlier county material described about 660 acres. The November 18, 2026 Board of Supervisors agenda describes approximately 649.309 acres to be redesignated from Employment and Moderate Low Density Residential to Green Energy Production. The agenda says the Planning and Zoning Commission recommended approval 5–3. That recommendation is not final Board approval. The Board hearing was noticed for November 18 at 9:30 a.m.; the sources reviewed did not establish its final vote, a recorded resolution, or any subsequent construction authorization. The requested action and proposed motion in an agenda are not proof that a motion passed.

For residents following the neighboring proposal, the useful next steps are to obtain the November 18 action summary or minutes, check for the recorded resolution, and monitor Pinal County for any subsequent zoning, lease, site-plan or permit notices. No later dated public hearing or comment deadline was verified in this review, and no new project-specific proceeding for the operating APS solar facility was verified. The timeline and calendar distinguish the neighboring proposal from the operating facility throughout.

Source review: November 19, 2026, Arizona time. The original involvement tutorial remains available below, supplemented by a current guide to the neighboring county case. This profile remains a work in progress.

Timeline & Milestones

Scroll or swipe to explore

  1. Operating Researched project record

    Facility commissioned in December 2016

    ASU does not publish the exact commissioning day.

  2. Completed Researched project record

    Facility dedication reported

    Project dedication followed commissioning.

  3. Operating Researched project record

    APS reaffirmed operating status

    APS described the 40-MW facility as operating.

  4. Completed November 2026 profile update

    September 2, 2026 — Separate ASLD solar/BESS proposal discussed

    County staff described approximately 660 acres east of the existing APS plant. This was a work-session record, not a construction permit for Red Rock Solar.

  5. Completed November 2026 profile update

    October 15, 2026 — P&Z recommended the separate ASLD proposal

    The official action summary records a 5–3 recommendation to approve without stipulations. This is not final Board approval and does not authorize construction at the operating Red Rock Solar facility.

  6. Completed November 2026 profile update

    November 2026 — Neighboring proposal scope revised in Board agenda

    The November 18 Board agenda describes approximately 649.309 acres, compared with about 660 acres in earlier materials. Final Board outcome has not been verified.

  7. Completed November 2026 profile update

    Adjacent ASLD solar/BESS PZ-PA-014-26 — Board hearing

    Noticed Board of Supervisors hearing for the separate ASLD solar/BESS proposal east of the operating APS Red Rock Solar facility. Updated agenda scope: approximately 649.309 acres. Final vote was not verified in the sources reviewed; a scheduled hearing or proposed motion is not approval.

    Adjacent ASLD solar/BESS PZ-PA-014-26 — Board hearing

    Noticed Board of Supervisors hearing for the separate ASLD solar/BESS proposal east of the operating APS Red Rock Solar facility. Updated agenda scope: approximately 649.309 acres. Final vote was not verified in the sources reviewed; a scheduled hearing or proposed motion is not approval.

    Full date and time
    Wednesday, November 18, 2026 · 9:30 am (America/Phoenix)
    Status
    Completed

    Source review November 19, 2026. Verify current notice before acting; schedule entry is not proof of an outcome.

    Related projects: Red Rock Solar

    Related entities: Pinal County

How to get involved

Current guide — Follow the neighboring ASLD solar/BESS proposal

Use the current official record and choose the right participation channel.

Updated November 19, 2026. This guide supplements, and does not replace, the original tutorials. All listed meeting times are Arizona time. Verify the latest notice before traveling, joining online or filing.

  1. Keep the two solar projects separate

    The APS Red Rock Solar facility is operating. PZ-PA-014-26 concerns a neighboring ASLD solar-and-battery proposal, not an operating-plant permit or a confirmed APS expansion. Use the county case number when requesting records or discussing that proposal.
  2. Check what the Board actually decided

    Open the November 18, 2026 agenda, then look for the action summary or approved minutes. A staff recommendation, draft resolution, or proposed motion is not a recorded vote. Look for any recorded Resolution 2026-PZ-PA-014-26 and its conditions. This source review did not establish the final Board outcome.
  3. Watch for the next real participation opportunity

    Check current Pinal County hearing notices for PZ-PA-014-26 and any related later zoning or permit case numbers. Follow the exact submission instructions and deadline on a new notice. Do not treat the passed November 18 hearing as an open comment window. No later dated hearing was verified in this review.
  4. Base questions on the latest proposal

    Use the latest acreage, site boundaries, battery layout and access information, and ask which approvals remain. Earlier material described about 660 acres; the November Board agenda uses approximately 649.309 acres. Ask the county to explain any revisions rather than assume the project has expanded or contracted for a particular reason.

How to participate in Red Rock Solar — Adjacent proposal only: PZ-PA-014-26

Use the verified project record and monitor the correct agency for the next live notice.

No open proceeding or ACC docket was verified for the operating Red Rock Solar facility. PZ-PA-014-26 identifies a distinct adjacent proposal only.

  1. Save the exact identifiers: Adjacent proposal only: PZ-PA-014-26

    Use Adjacent proposal only: PZ-PA-014-26 in searches, subject lines, comments, and records requests. Do not substitute a similarly named project or general-policy docket.
  2. Read the project-specific record

    Open the official record linked below and verify the present status, scope, meeting location, submission method, and deadline before acting.
  3. Treat old deadlines as closed

    The July 16, 2026 adjacent-project item was a work session, not a public hearing, and is closed.
  4. Monitor the next live notice

    Monitor Pinal notices for PZ-PA-014-26 only if following the distinct adjacent proposal; do not label it the operating Red Rock Solar docket.

Upcoming

No upcoming events currently posted.

Past events

Adjacent ASLD solar/BESS PZ-PA-014-26 — Board hearing

Noticed Board of Supervisors hearing for the separate ASLD solar/BESS proposal east of the operating APS Red Rock Solar facility. Updated agenda scope: approximately 649.309 acres. Final vote was not verified in the sources reviewed; a scheduled hearing or proposed motion is not approval.

Full date and time
Wednesday, November 18, 2026 · 9:30 am (America/Phoenix)
Status
Completed

Source review November 19, 2026. Verify current notice before acting; schedule entry is not proof of an outcome.

Related projects: Red Rock Solar

Related entities: Pinal County