Connections
Entity connections
- Parent organization or jurisdiction: United States of America (USA)
Connected projects
- Clean Air Act context: Eloy Valley Energy Center III
- Clean Air Act context: La Osa Data Center
- Clean Air Act context: La Osa Power Plant 1
- Clean Air Act context: La Osa Power Plant 2
- Clean Air Act context: Pinal Airpark MZJ
- Clean Air Act context: Project Bella Power Plant
- Clean Air Act context: Project Midway Data Center
- Clean Air Act context: Red Rock Railroad Classification Yard
- Clean Air Act context: Red Rock Solar
- Clean Air Act context: Saguaro Power Plant
- Clean Air Act context: Serrano Solar
- Clean Air Act context: Sunridge Power Plant
- Clean Air Act context: Verdin Solar
Synopsis
Section 107(d) of the Clean Air Act requires EPA to designate areas after a new or revised National Ambient Air Quality Standard takes effect. States and eligible tribes submit recommendations, and EPA issues the final designations. The three outcomes are Attainment (often reported as attainment/unclassifiable) when an area meets or is cleaner than the standard, Nonattainment when it does not meet the standard, and Unclassifiable when EPA cannot determine the status from available information.
A designation is tied to a particular pollutant and standard; it is not a general certificate that an area has perfectly clean air. Boundaries may cover an entire county or only part of one. EPA's Green Book is the primary current source for nonattainment, maintenance, classification, map, and downloadable boundary information.
The designation affects the permitting path for new major stationary sources. In attainment areas, Prevention of Significant Deterioration review generally requires Best Available Control Technology, air-quality analysis, public participation, and protection of allowable air-quality increments. For a pollutant in a nonattainment area, nonattainment New Source Review requires Lowest Achievable Emission Rate controls, qualifying emissions offsets, and public involvement. Those different requirements can materially change the cost, timing, and feasibility of a proposed facility.
Links
Official
- How EPA determines whether areas meet the NAAQS
- 42 U.S.C. § 7407 — Air quality control regions
- Current nonattainment-area reports, maps, and downloads
- Arizona county-level multi-pollutant designation information
- Prevention of Significant Deterioration basic information
- Nonattainment New Source Review basic information
- Marana Ordinance No. 2018.009
Connected entity profiles
Connected project profiles
Sources from connected projects
- Eloy Valley Energy Center III ACC Docket L-21375A-25-0252-00256
- Eloy Valley Energy Center III Eloy Valley CEC filing
- Eloy Valley Energy Center III Eloy Valley CEC materials
- Eloy Valley Energy Center III Pinal P&Z action summary
- Eloy Valley Energy Center III Recorded Resolution 2026-PZ-009-26
- Eloy Valley Energy Center III ACC public-comment portal
- Eloy Valley Energy Center III Official hearing notices
- La Osa Data Center PZ-PA-011-25 La Osa Project packet
- La Osa Data Center PZ-003-26 / PZ-PD-003-26 staff presentation
- La Osa Data Center April 2026 P&Z rezoning action
- La Osa Data Center May 27 La Osa Board item
- La Osa Data Center La Osa Power & Tech presentation
- La Osa Data Center Resolution 2025-PZ-PA-011-25
- La Osa Data Center August 26, 2026 Board meeting
- La Osa Data Center August 26 Board meeting video
- La Osa Data Center Official hearing notices
- La Osa Data Center Planning and Zoning agendas
- La Osa Data Center KJZZ La Osa decision report
- La Osa Power Plant 1 PZ-PA-011-25 La Osa Project packet
- La Osa Power Plant 1 PZ-003-26 / PZ-PD-003-26 staff presentation
- La Osa Power Plant 1 April 2026 P&Z rezoning action
- La Osa Power Plant 1 May 27 La Osa Board item
- La Osa Power Plant 1 La Osa Power & Tech presentation
- La Osa Power Plant 1 Resolution 2025-PZ-PA-011-25
- La Osa Power Plant 1 August 26, 2026 Board meeting
- La Osa Power Plant 1 August 26 Board meeting video
- La Osa Power Plant 1 Official hearing notices
- La Osa Power Plant 1 Planning and Zoning agendas
- La Osa Power Plant 1 KJZZ La Osa decision report
- La Osa Power Plant 2 PZ-PA-011-25 La Osa Project packet
- La Osa Power Plant 2 PZ-003-26 / PZ-PD-003-26 staff presentation
- La Osa Power Plant 2 April 2026 P&Z rezoning action
- La Osa Power Plant 2 May 27 La Osa Board item
- La Osa Power Plant 2 La Osa Power & Tech presentation
- La Osa Power Plant 2 Resolution 2025-PZ-PA-011-25
- La Osa Power Plant 2 August 26, 2026 Board meeting
- La Osa Power Plant 2 August 26 Board meeting video
- La Osa Power Plant 2 Official hearing notices
- La Osa Power Plant 2 Planning and Zoning agendas
- La Osa Power Plant 2 KJZZ La Osa decision report
- Pinal Airpark MZJ Pinal Airpark
- Pinal Airpark MZJ 2026 AMPU Draft Working Paper 1
- Pinal Airpark MZJ Pinal Airpark Master Plan Open House
- Pinal Airpark MZJ PIM No. 1 handout
- Pinal Airpark MZJ Development Services master-plan meeting update
- Pinal Airpark MZJ 2015 Pinal Airpark Master Plan
- Project Bella Power Plant ACC eDocket L-21314A-24-0144-00233
- Project Bella Power Plant Case 233 Notice of Hearing
- Project Bella Power Plant Bella Energy Facility Title V page
- Project Bella Power Plant Issued Permit V20700.A02
- Project Bella Power Plant PZ-012-25 / PZ-PD-007-25 Board packet
- Project Bella Power Plant Recorded PAD ordinance 2025-PZ-PD-007-25
- Project Bella Power Plant ACC public-comment portal
- Project Bella Power Plant Project Bella overview
- Project Bella Power Plant Project Bella filings and resources
- Project Midway Data Center PZ-PA-013-25 Project Midway packet
- Project Midway Data Center Resolution 2025-PZ-PA-013-25
- Project Midway Data Center July 16, 2026 P&Z action summary
- Project Midway Data Center Official hearing notices
- Project Midway Data Center Planning and Zoning agendas
- Project Midway Data Center Pinal Post — open-ended continuance
- Project Midway Data Center Pinal Post — July hearing preview
- Red Rock Railroad Classification Yard Arizona State Land Department
- Red Rock Railroad Classification Yard Red Rock Small Area Transportation Study
- Red Rock Railroad Classification Yard Proposed Red Rock classification yard discussions
- Red Rock Railroad Classification Yard UP yard not moving ahead
- Red Rock Solar ASU Red Rock Solar Project
- Red Rock Solar APS clean-energy projects
- Red Rock Solar McCarthy Red Rock Solar Plant
- Red Rock Solar Pinal P&Z July 16 packet
- Red Rock Solar Official hearing notices
- Saguaro Power Plant APS Saguaro Power Plant Expansion Project
- Saguaro Power Plant Saguaro virtual open house
- Saguaro Power Plant Existing Saguaro Title V permit
- Saguaro Power Plant Permit V20692.R01 document
- Saguaro Power Plant Saguaro permit technical support document
- Saguaro Power Plant Pinal industrial permit public notices
- Serrano Solar ACC Docket L-21165A-21-0341-00196
- Serrano Solar DOE/WAPA CX-031572
- Serrano Solar Longroad Serrano portfolio
- Serrano Solar Longroad Serrano financial close
- Serrano Solar ACC public-comment portal
- Sunridge Power Plant Sunridge Power project website
- Sunridge Power Plant Official state case file — ACC Case 266
- Sunridge Power Plant Official notice for the September 2026 hearing
- Sunridge Power Plant Developer’s presentation to Pinal County supervisors
- Sunridge Power Plant News report on the county Planning Commission meeting
- Sunridge Power Plant News report on the county’s approval
- Verdin Solar Verdin Pinal P&Z July 16 packet
- Verdin Solar Official hearing notices
- Verdin Solar Planning and Zoning agendas
- Verdin Solar Advanced Power projects
- Verdin Solar Advanced Power 2024 ESG report
Public Concerns
-
1 How the Clean Air Act Systematically Spoils Unspoiled Places
The Clean Air Act inadvertently incentivizes the industrialization of our unspoiled places, with tens of millions in benefits per project in some industries.
The sharp regulatory difference between attainment-area PSD review and nonattainment NSR creates a powerful siting advantage for cleaner rural places near metropolitan areas. It makes the landscapes, farms, habitats, views, and quiet communities most worth preserving financially attractive targets for major industrial development.
What the law requires. Congress directed EPA to set health- and welfare-based national air-quality standards and designate every area after a standard is issued or revised. Governors and eligible tribes recommend boundaries and statuses; EPA makes the final designation. Each designation applies to a particular pollutant and standard, and its boundary can divide counties and municipalities.
How the incentive works. A new major source in an attainment or unclassifiable area generally proceeds through Prevention of Significant Deterioration review. PSD is real regulation: it can require Best Available Control Technology, air-quality modeling and analysis, public participation, and proof that emissions will not violate the NAAQS or consume more than the applicable increment. But a major source proposed in a nonattainment area faces the more demanding nonattainment New Source Review path, including Lowest Achievable Emission Rate controls and emissions offsets.
Why the difference is worth millions. EPA describes offsets as real emission reductions, generally obtained from existing nearby sources, that counter a proposed emissions increase and produce a net air-quality benefit. They are not a tax paid to EPA. They are scarce, difficult to assemble, and expensive, and required ratios can exceed one ton reduced for each ton added. Avoiding LAER and offset obligations can deliver tens of millions of dollars in comparative benefit on a single project in industries with large emissions profiles. The system therefore places a financial premium on building where the air is cleaner.
The system spoils the unspoiled. Developers comparing sites see cleaner rural areas near transmission lines, pipelines, highways, water, and metropolitan demand as places where a major source can avoid the additional LAER-and-offset path. Those places often have smaller local governments, fewer technical specialists, and less money to evaluate applications than the corporations seeking approval. Revenue promises and compressed schedules deepen that imbalance. The regulatory structure does not merely fail to protect unspoiled places from this pressure; it creates the pressure.
What people experience without seeing the mechanism. People in rural communities watch one industrial proposal after another take the peace, darkness, open views, farmland, habitat, and breathing room that drew them away from industrial conditions in the first place. They understandably struggle to explain why industry keeps targeting lovely remote places. The designation system’s hidden siting incentive supplies part of that answer: cleaner air is treated as cheaper industrial capacity.
Why this contradicts the law’s purpose. The Clean Air Act exists to protect health and welfare, including visibility, crops, vegetation, animals, and buildings. A system serving that purpose should not sacrifice cleaner landscapes in sequence. An attainment designation cannot be allowed to function as an invitation to consume the very environmental quality the designation records.
Local relevance. Marana crosses the Pima–Pinal county line. The portion of the tracked Tortolita Specific Plan Amendment at issue here lies in Marana’s Pinal County annexation. The nearby designation boundary makes the comparative permitting advantage visible. This does not establish why a particular applicant selected a particular parcel or what motivated an annexation; project-specific records must answer those questions. It does establish the structural incentive every applicant and public decision-maker operates within.
What must change. EPA, Congress, states, and permitting authorities must confront and correct this incentive. Every major-source review should disclose how designation status affected site selection, compare already-industrialized alternatives, account for cumulative land and community loss, and apply location-neutral safeguards. Clean Air Act protections must remain strong without making attainment areas the industrial path of least resistance.
Air-quality designation context
Arizona reference map supplied for community context. Designations are pollutant- and standard-specific; use EPA’s live Green Book for current legal status and exact boundaries. This static image is not a legal boundary determination and may become outdated. National reference map supplied for context, illustrating how designated areas are concentrated around many metropolitan and industrial regions. Consult EPA’s live Green Book reports, maps, and downloads for current pollutant-specific designations. Supporting links
- How EPA determines whether areas meet the NAAQS
- 42 U.S.C. § 7407 — Air quality control regions
- Current nonattainment-area reports, maps, and downloads
- Arizona county-level multi-pollutant designation information
- Prevention of Significant Deterioration basic information
- Nonattainment New Source Review basic information
- Marana Ordinance No. 2018.009
Timeline & Milestones
Project process not yet mapped. Required and voluntary milestones will appear here when this profile is completed.
How to get involved
Participation guides not yet published. Step-by-step ways to take part will appear here when this profile is completed.
Upcoming
No upcoming events currently posted.